Uptime and servers

Ask the questions you’d ask a colleague

Your agent pulls what it needs from your account, connects the dots, and gives you a clear answer. These are real conversations.

AI agent investigating an outage with HetrixTools diagnostics

Builds a timeline from downtimes, location fail logs, network diagnostics, and server agent metrics, then pinpoints where the problem was.

Blacklists

Make sense of your blacklistings

Ask about a single IP, a domain, or a whole IP block, and get what’s listed where, what changed, and what’s worth looking into.

Listings

Find out why an IP got blacklisted

Got a blacklist alert? Your agent checks which RBLs listed the IP, compares that with its listing history, and tells you whether it’s a one-off or a relapse, along with what those RBLs usually point to, such as a compromised host or an open relay.

Patterns

Spot the patterns behind your listings

See which IPs keep getting listed, which RBLs keep coming back, and when to expect the next listing.

Filters

Filter by RBL, IP range or time frame

Pull up every Spamhaus listing from the past week, complete with delist links.

What it can reach

Your whole account, one question away

Your agent works with the same data you see in your dashboard, limited to what its API key allows.

Uptime monitors

  • Status of every monitor
  • Uptime reports and downtimes
  • Location fail logs and network diagnostics
  • WebSnapshots, private notes and new monitors

Server agents

  • CPU, RAM, disk and network history
  • Running processes
  • Warning policies, read and updated
  • Install commands for new servers

Blacklist monitors

  • Listings and delistings, per RBL
  • Blacklist history for IPs and domains
  • On-demand blacklist checks
  • New blacklist monitors

Maintenance

  • Scheduled maintenance windows
  • Maintenance mode on or off
  • Alerts paused during the work

Status pages and contacts

  • Your status pages
  • Your contact lists

Account

  • Your activity log
  • What the API key is allowed to do
How it works

Connect your AI agent in minutes

No software to install. Our MCP server is hosted by us, all you need is an API key.

Your AI agentChatGPT, Claude, Grok, …
MCP
HetrixTools MCP servermcp.hetrixtools.net
API
Your HetrixTools accountLimited by your API key
  1. Create an API key

    Create a dedicated API key from the API Keys page of your account, and limit it to the API calls and monitors your agent needs.

    Limiting an API key to specific API calls and monitors
  2. Add HetrixTools to your AI agent

    In your AI agent’s connector (or plugin) settings, add a custom connector named HetrixTools, with this server URL:

    https://mcp.hetrixtools.net/
    Adding HetrixTools as a custom connector
  3. Paste your key and allow access

    Paste your API key on the HetrixTools authorization page and click Allow. That’s it, you can start asking questions right away.

    Authorizing an AI agent with a HetrixTools API key

Step-by-step guides for ChatGPT, Claude, Grok and other AI agents are in our documentation.

Security

You stay in control

Your agent only gets what its API key allows, and you can cut it off at any time.

Your API key, your rules

Limit each API key to specific API calls, and to specific uptime monitors, blacklist monitors, contact lists, or status pages.

Read-only if you prefer

Give your agent a key with read access only, and it can look at your data without changing anything.

Approve actions first

Many AI agents let you choose which tools can run automatically and which ones need your approval.

Revoke access at any time

Delete the API key from your account, and your agent’s access is cut off at once.

Nothing stored along the way

Our MCP server relays each request between your agent and our API, without storing your API key, your requests, or our responses.

Nothing to install

Our MCP server is hosted by us. All your agent needs is the server URL and an API key.

FAQ

Questions, answered

Anything else? or browse the documentation.

The Model Context Protocol (MCP) is an open standard that lets AI agents connect to outside tools and data. Our MCP server connects your agent to your HetrixTools account, through our API.

MCP Server

Included in every plan, even Free

MCP access is available on all Uptime Monitor and Blacklist Monitor plans, including our Free for life plans.

User reviews

What our customers say

See what our clients are saying about our services.

We use Hetrix to manage our IP Blacklist status and then process the de-listing using the dynamic links. We came from another provider, great service and great price.
Zulu eDM
Guardian Hosting has been utilizing StatusCake over the past few months to monitor our servers uptime. Recently, we started to use HetrixTools to monitor the network of our cabinet. We're currently on the free plan, just testing the uptime of one of our IPs, and we also use the free IP blacklist tool to ensure our IPs don't get blacklisted. Luckily by using this tool, we managed to find out that every single one of our IPs that were allocated to us were blacklisted, and we found out easily had those delisted. Now, we use HetrixTools to ensure that we can show our clients a report of us maintaining a good network uptime, and a tool for us to make sure our IPs don't get blacklisted, and if they do, to get them delisted.
Guardian Hostingguardian-hosting.com
Easy to track and monitor all, all in one place, same like Hostiso services, we love simplicity, easy to use and most important correct information.
Hostisohostiso.com
Just wanted to say I've been meaning try your services since you launched and just got around to it last week... I'm testing with the free tier and I'm super impressed! Your company has exceeded my expectation and IMHO better than your competitors. Honestly, surprised to see this great of a service in so little time. Keep up the great work, I should be upgrading sooner than later to professional!
ilovetheheatwebhostingtalk.com
It has been a great service so far, I used to use mxtoolbox before and shifted to hetrixtools for about a month now. I find hetrixtools better and accurate with additional blacklists than mxtoolbox.

I will add a higher plan and shift all my IP checking to hetrixtools shortly. Keep up the good work (y)
mellow Hostmellowhost.com
We've been using another monitoring platform since our inception. We stumbled across HetrixTools monitoring whilst searching for a blacklist monitoring service and are glad we did. The feature set and pricing point is amazing and the documentation and support are fantastic.
Galaxy Web Solutions Ltdgalaxywebsolutions.com
We use both of your premium services for our business. Everything is clean, simple and very professionally designed.
Cienen.com
We've been using HetrixTools for years to monitor our domains and dedicated server nodes. The platform's Server Agent provides a centralized view of resource utilization, helping us keep track of performance and ensure smooth operations. It has been invaluable in maintaining server health and quickly identifying potential network and hardware issues.
PineRiverpineriver.net
We like the easy access to data and making reports. Also reputation issues just became much easier to solve in the daily operations. This is just what we waited for - love disruption.
MYSMTP.eu
We are a small team who maintains heterogeneous dedicated servers for our customers. HetrixTools flexibility and Telegram integration is great for our needs. Plus, developer response is awesome when required a new feature for Server Agent.
Estudio Nexosestudionexos.com
We've been using HetrixTools Uptime monitor for a few years, just to track a few links, very useful tools, we might not be the largest user of it, but it's certainly worth its merit of getting the job done. We even use it as a failsafe to track our Zabbix server.
Citadel Serverscitadelservers.com
A perfect tool to identify spammers before you receive abuse complaints. Value for the money.
ServerAstra Ltd.serverastra.com
We love it, has helped us detect outages on all of our systems to make sure our clients have the best experience possible.
Owehostowehost.com
I have been using the HetrixTools platform to monitor my website's uptime and my network's uptime in Dallas. I have also been using it to monitor about 300 IP Addresses to keep my network clean for my customers. I used this for 1 month then stopped, but I plan to use it long term now because the pricing is so great.
SSDBlazessdblaze.com
We are using it for the monitoring of all our IP's used. And we LOVE your service.
ESP-Service
To keep a closer eye on the health of our entire IT system, we employed HetrixTools. When it comes to keeping our network clean for customers, we've been using this tool as well. It's been more than four years into our relationship with HetrixTools. We've saved a lot of time, thanks to HetrixTools. Our services have benefited greatly by using this platform!
Interactions with the HetrixTools staff have been a pleasure as well since they answer quickly and offer solutions when requested.
SMTPServersmtpserver.com
We've been monitoring our IP space recently for the past 4 months and found the service to be invaluable in ensuring our customers don't have issues with email deliverability. This company provides a valuable service at a reasonable rate compared to some other larger names out that charge much much more.
PeoplesHostpeopleshost.com
We have been using Hetrixtools for the past three years, and it was always perfect. Not only do we use the Discord and Slack notifications in addition to the RAID monitoring and, on top of all, a functional status page, all for very affordable pricing; we couldn't ask for better.
Hostartshostarts.com
Using it to monitor uptime and track resource usage of customers managed VPS and Dedicated Servers. Also tracking IP addresses for shared hosting servers in the blacklist monitors.
MattWServicesmattwservices.co.uk
An essential service for monitoring our servers and customer servers.
ShopFactoryshopfactory.com.br
Knowing an IP is listed, and quickly troubleshooting reduces support requests, and increases customer satisfaction, HetrixTools provides us with the tools and reports that gives us the time to react much more efficiently than other similar services.
That, translates to even more satisfied customers and better reputation for our own services.
GOZENgozenhost.com
HetrixTools has been nothing short of excellent. It's continually developed and improved upon, quickly reacts to changes and notifies our staff of any discrepancies. The API works great as well, and the service is affordable beyond belief compared to what it offers. Keep it up!
MightWebmightweb.net
We use HetrixTools to monitor our entire infrastructure. The Opsgenie integration works seamlessly to alert our team to any downtime, and makes HetrixTools a fantastic platform for us.
Shockbyteshockbyte.com
I would just like to leave a mini review for this service as it is excellent! Their control panel is very easy to use, IPs are monitored automatically, and you are notified of any changes IE when your servers go offline and come back online again.

It is well worth the money. We are using the Business Uptime Monitoring package.

Support even let me know I forgot to update the title on embed code and suggested me to change the background colour so it blended with our website better, which I forgot to do been as I was revamping the whole website.

We use both HetrixTools's Blacklist monitoring and Uptime monitoring services now.

Congrats Andrei/HetrixTools

Best regards,
Chris
Chrishostxnow.com
HetrixTools Blacklist Monitors helps us keep an eye on activities from our dedicated servers, VPS cloud and datacenter colocation customers. The regular updates really go a long way towards helping our techs stay pro-active in detecting possible outbreaks and notifying customers of issues that require their attention.
VIRTBIZvirtbiz.com
HetrixTools asegurar que nuestros clientes no tengan problemas para enviar correos.

HetrixTools ensures that our customers do not have problems sending mail.
dedicados.com.mx
We've gone through several server monitoring solutions but weren't able to find something that met our needs. This changed once we started using HetrixTools. The platform proves an eloquent solution, monitoring our servers & displaying our status to customers has never been more convenient.

Both our employees and customers derive value from the clean and simple public status page in order to troubleshoot issues and identify potential problems.

On top of this, interactions with the HetrixTools team have been very pleasant - they are fast to respond and provide solutions.
GGServers Ltd.ggservers.com
HetrixTools has our back every single time. The moment one of our sites goes down, we know about it in seconds — not minutes. And the alerts are endlessly configurable, so we get exactly the notifications we need, the way we need them. Simple, reliable, and it just works.
K & K Web Servicesknkws.com
Hetrixtools has been fantastic since day one, we use it to monitor IP blacklist, services downtime and monitor agent to monitor our disk healthy. Really recommend to everyone.
AlbaHostalbahost.net
HetrixTools has rapidly become the mission critical intelligence layer of Fusion Arc Hosting, delivering real time visibility, instant uptime alerts, and actionable insights across every node in our network. It empowers our team to identify and resolve issues long before they impact customers, and has grown into a foundational component of our Network Operations Center as we scale nationwide and, soon, globally. By extending real time status and performance transparency to our clients, HetrixTools also strengthens our commitment to a fully open and trustworthy hosting experience.
Fusion Arc Hostingfusionarchosting.com
We are thrilled to share our positive experience with HetrixTools. Since switching from UptimeRobot, we have been impressed with the amazing features that HetrixTools offers. We are currently using their uptime report, which is displayed on our website to keep our customers informed and updated - https://status.gossdhosting.com/
Undoubtedly, HetrixTools is one of the finest uptime providers we have ever joined, and we are happy to be their customer.
Thank you for providing such an exceptional uptime monitoring service.
GoSSDHostinggossdhosting.com
We've been using HetrixTools for a few months mainly for our public facing status page for our clients as we believe in transparency. The reports are really useful and extremely accurate, the best we've tried so far.
Although we are mostly using it for our clients to see, it's been very useful internally amongst our team too. We love how it also allows us to change the status message at the top at a moments notice very quickly if something went wrong i.e. one of our servers went offline, scheduled maintenance etc.
We would highly recommend this company for any business.
Roqitt Hostingroqitthosting.co.uk
We found at HetrixTools a simple and efficient way to get sensitive data from our managed servers. The interface is clean and everything is intuitive, and that's wonderful.

Encontramos em HetrixTools uma maneira simples e eficiente de obter dados sensíveis de nossos servidores gerenciados. A interface é limpa e tudo é intuitivo, e isso é maravilhoso.
SIERTIsierti.com.br
Experience has been good, easy to use, navigate around the platform... Good way to keep an eye on IPs.

It will help us keep spam from our hosting to a minimum.
torpixhosting
We have relied on HetrixTools for nearly six years to help monitor the thousands of servers we manage at any given time. Throughout that time, it has been essential to be quickly notified of downtime or similar situations, which has saved our team hours upon hours of maintenance and helped maintain a strong level of uptime and reliability for our clients.
Sparked Hostsparkedhost.com
Excellent Monitoring Tool. Easy to use interface. Very prompt notifications through many channels. An indispensable tool for Server Admins. Highly Recommended.
BizzHost-Adminwebhostingtalk.com
We have been using HetrixTools monitoring platforms for blacklist and uptime monitoring for a while now. It has really been helpful for us, helping us monitor and track incidents, gave us our independent status page for our customers to check on their services, and the API keys allowed us to integrate the services with our internal alerts apps to immediately notify the engineer on shift if anything goes wrong. We have not had a single issue with the platform since our migration to it and plan to keep using it for years to come.
Sivdasivda.com
@HetrixTools , your service absolutely rocks! Thank you very much! #servers #monitoring #DevOps #Linux
Cristian O. Balan - @oviliztwitter.com
We are using HetrixTools to have a global view on our gaming server network, why lose time to develop a tool when Hetrix managed everything for us?
Starlancerminecraft-hosting.pro
Love the new features with @HetrixTools where we can see how long our #nvme drives in our server has been used for and how often it has been rebooted.
Expert Tech - @ExpertTechBarrytwitter.com
I've recently begun using the HetrixTools platform to monitor my email IP addresses to minimize the impact of blacklisting as well as website monitoring to be alerted in real-time of issues with my websites.
PDS Solutions, LLCpetrodatasync.com
We use HetrixTools to monitor all of our servers and websites. We've been using many other services before, but none of those have fulfilled our needs like HetrixTools did. We saved a lot of time compared with other tools, it's just so easy to setup! The reports are very accurate and the WhiteLabeled Report page works like a charm! All in all, HetrixTools is the best solution on the market for monitoring Servers and Websites for both Individuals and Business.
LowEndBoxes
As we are growing rapidly with our cloud servers, and adding our own ARIN IP range, HetrixTools keeps us ahead of major issues. Knowing an IP is blacklist, and quickly troubleshooting reduces support tickets, and increases customer satisfaction. After some research, I truly believe that HetrixTools the most cost effective solution to manage blacklists.
RebelNetworksrebelnetworks.com
Boom Host has been using your Business Uptime Monitoring features for the past 5 months or so. Both our NOC and Server Admin teams just love your service and the great features you guys offer through sub-accounts.
Boom Host Incboomhost.com
We use it for blacklist monitoring and uptime monitoring. This service has been a big help to us by getting notifications when our servers are down or an IP of ours is on a blacklist.
XHostFirexhostfire.com
We have been using HetrixTools for several years, from the beginning as a free package, then we decided to upgrade to a paid version, now we control more than 20 servers that we know are online thanks to HetrixTools.
MediaCPmediacp.eu
We've been using HetrixTools to make sure that the servers, our site and our customers' sites operate on are never down or have blacklisted IP addresses. We even configured HetrixTools to tell our team through Slack if something ever goes wrong. It's an intuitive platform and great for automated checks. We'd highly recommend it to anybody.
UncommonTrend Solutions, LLC.
We’ve been using HetrixTools to monitor our servers and showcase our uptime SLA publicly, and it has been an excellent experience. The platform is user-friendly, reliable, and packed with features that make server monitoring effortless.
The uptime reports are detailed and professional, providing our clients with full transparency about our services. The public status pages are a fantastic way to build trust, as they clearly demonstrate our commitment to maintaining high availability.
Additionally, HetrixTools' alerting system ensures we’re immediately informed of any downtime, allowing us to address issues proactively and minimize disruptions. Their pricing is competitive, and the level of service they provide is truly exceptional.
We highly recommend HetrixTools to anyone looking for a reliable and feature-rich server monitoring solution. It has become an essential part of our operations.
Mikro Cyber Cloudmikrocyber.org
Hello.. i am using the hetrixtools.com service for the monitoring of the ip's.. i must say this service is really awesome and their support top notch and fast.. i was using some other service for the monitoring i would like not to mention here online (famous one) and this hetrixtools.com is top compare to this before..easy to manage the ip's and friendly website for a starter not like the rest which ask you for bunch of money in every single step.. i would like just to notify other people who may interested into this and to write how things are.. thank you
-liquid-webhostingtalk.com
I've been using Hetrix Tools for 5ish years now.. free package 3 monitors one for each IP i have pointing to port 80 so as to emulate normal traffic with a telegram bot for intimidate warnings for down time. Never had a false positive .. NEVER and the up time monitoring for a free service is just.. stellar.
neijekwebhostingtalk.com
Great tool to monitor in Internet our company reputation and maintain defense against attacks.
www.subastasventura.com
The uptime monitor has allowed me to get instant notifications of down time. HetrixTools sends me notifications before my hosting company even realizes there is a problem. This has been invaluable on keeping our systems up and running. Our employees are able to work within our extensive Intranet with minimal downtime.
Guerrilla RFguerrilla-rf.com
We have recently deployed the Hetrix monitoring and blacklist monitors to all of our servers within our infrastructure. It has been incredibly valuable to us for both keeping track of our uptime in accordance with our SLA and also to receive notifications as soon as anything is disrupted. This has allowed us to proactively resolve availability issues before our customers are impacted. The SMS alerts are a great solution to speed up the response time to these faults.
Cybranceecybrancee.com
I use Hetrix from the beginning and I love it.
www.dedoho.pw
HetrixTools allows us to ensure that all customers have the best experience possible, and root out those who abuse our network.
InertiaNetworks
Very good platform and keep NOC team alert of any issues.
GB Network Solutionsgbnetwork.my
I been trial the service for long time and I found that it is reliable, therefore I am moving away from Pingdom as they aren't what they used to be.
LusoAlojalusoaloja.pt
The service has been great to monitor our own servers as well as our clients servers and their broadband connections for uptime.
Expert Tech IT
We let people co-create across social media and email. To make sure invitations and notifications for collaboration projects don't get lost in spam filters it is of the utmost importance for us that our web-server doesn't get blacklisted. HetrixTools helps us to do so.
bindrs
HetrixTools provides us with valuable external monitoring that we can trust. The analytics logged during outages prove extremely valuable in determining commonalities between issues to aid in resolving the underlying issue(s) faster.
KnownHostknownhost.com
We’ve been using HetrixTools to monitor our servers, and it has proven extremely reliable. The alert system works flawlessly, with instant and accurate notifications, and the Telegram integration makes it especially convenient for our team to stay informed in real time.
X2 Networkx2.network
HetrixTools provides us with the insights critical in maintaining a favorable reputation across all of our platforms and throughout the internet - the Slack integration are a massive bonus that keeps our team in the loop without disrupting regular work flows.
Portal Network Co.portal.net.co
HetrixTools has really become a go-to tool for our day-to-day operations, way more practical than traditional options like Netdata for keeping a close eye on our servers. The interface is clean, straightforward, and brings everything we need to see about our infrastructure together without any hassle. Beyond tracking performance, the automated health warnings and wearout alerts for our SSDs have saved us from quite a few close calls, letting us swap out drives before any of our clients even notice an impact. Another thing that makes a massive difference for keeping our network safe is the constant IP blacklist monitoring, which helps us protect our IP block reputation and jump on any issues right away.
HypeHosthypehost.com.br
We have been using HetrixTools platform in order to monitor our significant amount of IPs throughout all our network. We have been looking for such a solution and opted for internal solutions until we found about HetrixTools. It does very well and beyond what it does with an excellent and unexpected customer services. The interface is slick and easy to use. Absolutely Recommended!
HostStagehost-stage.net
Elixant Technology has been utilizing HetrixTools for both Blacklist and Uptime monitoring of our IP ranges. Up until we started using HetrixTools we would spend countless hours each day checking our ranges IP by IP to ensure we were clean. Now, every day we receive notifications like clockwork letting us know if something is out of the normal! Not only has this made things easier for us, but also it gives us peace of mind every time we add more IP space to our network.
Elixant Technology
HetrixTools has saved us a lot of time over the years. This platform offers great value!
AltusHost B.V.altushost.com
We at Ertomedia use HetrixTools to monitor all the hosting servers for our client's website and the results are satisfactory. Plus there is also the option to customize the status report in accordance with our brand is a value added compared to other services.
Ertomedia
HetrixTools has been a lifesaver. We've tested other platforms, but we always come back. The pricing is great alongside a very reliable platform that is easy to use as well. Being able to have separate accounts for all our employees and specific customers, allows us to be transparent while providing access when required.
DreamIT Hostdreamithost.com.au
As we are in the hosting industry, sometimes we have clients who abuse our network. We use HetrixTools to monitor our IP's to see if we are on any of the blacklists. HetrixTools does the job, and it does it very well.
localnodelocalnode.net
We have been using HetrixTools for around six months now, for uptime reports and IP blacklist monitors. The notification and maintenance systems are great and the API integrates well with alternative notification methods.
Ho-ostho-ost.com
Ha - HetrixTools launched the same year (almost the same month!) that I started my website! :) It took me three years to learn about the service and start using it - and now it's been around seven years that I’ve been a happy HetrixTools user.

The service is excellent – it alerts me when something’s wrong so I can fix it quickly, and it doesn’t trigger false alarms (just as important!).

A reliable, silent partner that’s been with me for years – no fuss, no pompousness.

HetrixTools deserves all the praise it gets. I've tried several alternatives, but HetrixTools remains my favourite uptime monitoring tool – and I'd even dare say: it's probably one of the best on the market.

Relja
BikeGremlinbikegremlin.com
Being able to see server resources plus uptime is a game changer for us.
Site Arrowsitearrow.com
Trusted by View all customers